Please note: this meeting has been deferred.
Meeting Name: Committee on Resiliency and Waterfronts (inactive) Agenda status: Deferred
Meeting date/time: 1/11/2021 Deferred Minutes status: Deferred  
Meeting location: REMOTE HEARING (VIRTUAL ROOM 2)
Published agenda: Agenda Agenda Published minutes: Not available  
Meeting video:  
Attachments: CLICK ANY FILE # BELOW (in blue) TO ACCESS LEGISLATION AND ATTACHMENTS
File #Ver.Prime SponsorAgenda #Agenda NoteNameTypeSummaryActionResultAction DetailsMultimedia
Int 2092-2020 *Costa G. Constantinides  Climate resiliency design guidelines and resiliency scoring.IntroductionThis bill would require the Office of Long-Term Planning and Sustainability (OLTPS) to develop climate resiliency design guidelines, pursuant to a pilot program, for City capital projects. OLTPS, in consultation with other City agencies, environmental justice organizations with expertise in climate resiliency, and members of the public with expertise in climate resiliency, climate design, the built environment, engineering, and environmental justice issues, would also use the climate resiliency design guidelines to develop a climate resiliency score metric for capital projects. Such score would account for flooding risk, energy efficiency, energy resilience and on-site water capture and management. Every City capital project above a threshold construction cost would be evaluated for its resiliency and have to meet or exceed a minimum resiliency score.   Action details Not available
Int 2198-2021 *Steven Matteo  Additional freeboard for structures in the floodplain.IntroductionThis bill would require that most structures located in the floodplain be elevated an additional one-to-two feet, or by the 500-year flood elevation, depending on the type of structure, to provide additional floodproofing of those structures.   Action details Not available
Res 1389-2020 *Justin L. Brannan  Congress to restore funding to the United States Army Corps of Engineers’ New York-New Jersey Harbor and Tributaries Focus Area Feasibility Study.Resolution    Action details Not available